Sean Lewis AGC of Washington
(206) 284-0061
ddhondt@agcwa.com
http://www.agcwa.com/
As winter marches on, consider flexible scheduling on the jobsite. Seriously adverse winter weather will often shut down a site by necessity, but don’t be afraid to roll with the forecasts and plan work accordingly to fit travel and project needs. Once everyone is on site, allow ample time to gear up for the temperatures and break often to warm up.