Amira Beidas AGC of Washintong
(206) 284-0061
[email protected]
http://www.agcwa.com/
On February 17, newly revised general permitting for jobsite stormwater discharges took effect. The most important aspect? States can now oversee their own stormwater-permitting programs and use the new federal general-permit rules as a model for their permits. Click or tap this link for more in-depth news on this developing story.